Drywall and windows installed!
February 24, 2023
The installation of drywall was completed earlier this week, and the window installation should be finished by the time this post is up! Now that the walls are up and natural light is coming through the windows and filling the inside of the building, it is becoming easier to picture what the finished product will look like. Natural light is a HUGE part of the design of our new hospital. Natural light is not only good for the healing process of our pets, but it’s also great for the people who work in this space and for our clients. The windows throughout the building also affirm our commitment to transparency. We never want people to feel like we are hiding anything from them. We want the world to see our team’s care for our patients. Our interior doors and windows are the next items to be installed.
ONE WEEK FROM DRYWALL
January 25, 2023
Everything is in place for drywall to come in next week. Walking through the construction now, you have a great feel for how the rooms will feel. We can’t wait to experience the benefits of a wellness wing, with exterior entrances to the exam rooms and patio space available to really reduce the fear, anxiety, and stress of nervous pets. Our medical wing is designed to facilitate the most efficient flow to ensure quality care for sick and hospitalized pets. And check out that garage space!
Raise the Roof!!!!
December 1, 2022
What a difference two weeks can make! Our framing contractor, Garbison Construction, wasted no time in framing out the downstairs of the new Family Pet Health hospital building. They have already turned their attention to setting the roof trusses. If you are interested in seeing a video walkthrough of the hospital, be sure to follow us on Facebook, Instagram, and TikTok where Mr. Shirley is always posting live video updates!
Taking Shape
November 17, 2022
The building is starting to really take shape as the framing crew has begun putting up the walls this week! It has been amazing to watch as our dream of designing a Fear Free veterinary hospital is coming to reality right before our eyes. I stopped by this week to check on the progress, and I think the construction crews thought I was the OSHA inspector! They didn’t have anything to worry about, because this is one of the finest crews I have ever seen.
New Foundation Goes In
November 04, 2022
The concrete floor slab went in today. Next step—WALLS!!!
#HereWeGrow
Overhead view
& Footers
October 11, 2022
The sewer lines are being put in at the new hospital location! Over the next two weeks, all the plumbing lines will be set in place. Once they are inspected, we will cover them with gravel and prepare to pour the concrete slab. This view helps to show the size of our project. We will have 10 total exam rooms to better meet your needs!!! #HereWeGrow
Groundbreaking
September 27, 2022
Thank you to all who attended on Tuesday. We are so thankful for you all!